ATIC Home HASP Home LaACES Home HiSGRI Home LaSPACE Home LSU Physics
Participants Science Instrument Multimedia Status Links Private ATIC
ATIC Pictures ATIC Video ATIC Picture Archive

 

 


Initial Weatherport Setup - October 31, 2002


353.7 KB
Title: Weatherport looking toward bay doors

397.2 KB
Title: Weatherport looking toward read

357.1 KB
Title: Lifting the top science package from the shipping crate

417.3 KB
Title: Top science mounted in frame with campaign flag in back

407.2 KB
Title: Computer area setup

402.9 KB
Title: Electronics / mechanical area setup

463.5 KB
Title: Instrument with the BGO calorimeter waiting for mounting

404.9 KB
Title: Instrument stack starting to be tested

379.9 KB
Title: Installing power in the Weatherport

Page 1 of 1

   
All Flight Systems run on QNX Realtime OS.    
Site Manager:
Webmasters:
  Doug Granger
Doug Granger