ATIC Hangtest - December 1, 2002
PICT0289.jpg
90.9 KB
Title: Wheeling ATIC out of the Weatherport
PICT0291.jpg
98.6 KB
Title: Attaching the Rotator
PICT0293.jpg
95.3 KB
Title: Preparing for the Mantis to Lift ATIC
PICT0295.jpg
82.7 KB
Title: Wiring up The Rotator
PICT0296.jpg
72.5 KB
Title: Full Shot of the Hang Test
PICT0301.jpg
105.0 KB
Title: Attaching the SIP PV Arrays
PICT0303.jpg
81.4 KB
Title: Wiring the PV Arrays
PICT0305.jpg
107.1 KB
Title: Attaching the Ballast Hopper
PICT0314.jpg
68.2 KB
Title: Derek preparing to switch ATIC to the Launch Delta
PICT0315.jpg
100.8 KB
Title: Full View of the Mantis-Delta Change Over
PICT0316.jpg
97.8 KB
Title: Releasing the Mantis
PICT0329.jpg
95.2 KB
Title: Taking a little Joy Ride
PICT0332.jpg
83.8 KB
Title: Returning ATIC to the Weatherport
PICT0335.jpg
95.1 KB
Title: Weighing ATIC
PICT0339.jpg
106.1 KB
Title: Dropping the SIP PVs and re-attaching the Wheels
PICT0340.jpg
111.4 KB
Title: ATIC and the SIP PVs back into the Weatherport
Page 1 of 1
All Flight Systems run on QNX Realtime OS.
Site Manager:
Webmasters:
Doug Granger
Doug Granger